Wednesday, April 20, 2011

The curse of the Messy CAD database.

A number of years ago I encountered a management practice that was based on the principle of “the least I know of what is going on behind the curtain the more successful a manager I can become”;

This may well work for you (if you are a successful manager) – however, let me give you a small tip:

If you are in a management role of a consultancy (building design or construction related) and are not hands on, get assistance with your data management.
Specifically: how your building data is managed, no matter if drawing, flat-model or 3D model based.

Don’t be smug. I can just about bet on any office running on very low efficiency because of the state of the working files. You may not see this, take my word for it!

Having a CAD manager does not ensure you are safe, neither is an IT department. No CAD manual, book of procedures or list of policies will protect you.

Many managers ( designers, supervisors) tell me: “as long as the drawings look OK, I don’t care how they’re done”.

As noted before, I have an affinity with the Restaurant Industry – so, accept this question to be relevant:
Would a self respecting chef allow a messy pantry, dirty bench, scattered tools and staff walking knee deep in potato peel?

Gordon Ramsay, care to comment?



Tuesday, April 19, 2011

Buildings aren’t cars, microwaves or ipods.

They may be called machines for living, however they are not easily mass producible.
(not even through modular designs – as sites, users, conditions vary enough between instances to make them unique and consequently unlike manufacture);

So, why do we so often bring in manufacture as the ‘leader’ to follow, when we try to improve building delivery processes?

I don’t quite know why this is happening, our natural tendency to find parallels between familiar systems has something to do with it.

I also have a (slightly quirky) alternative view relevant to this;
I believe that, the following industries have more common with building delivery than manufacture:
Food & Beverage (more the slow than the fast variety)
Transportation
Emergency Medicine

Not convinced? They all face issues that are common with design/documenting/construction:

They all manage suppliers that vary in quality and can let them down at short/no notice.
Their processes are highly manual and rely on skills of individuals.

Most importantly, the Time/Quality/Price triangle is heavily tipped towards the time for all of them.

A restaurant will have to deliver within a very limited timeframe.
Transatlantic travel on a boat may be pleasant and cost effective but most people still choose to fly and when it comes to life or dead situations that A&E services deal with, time is absolutely critical.

Keep an eye out for  those industries!


Monday, April 18, 2011

The magic wand is truly magical, but use it with caution!

Revit is hard to love. (and not for the lack of trying!).
The myriad of tables that need to be filled out to get to almost anywhere
(I know, there are alternative ways, still...)
and the names the software developers choose for their tools!
Example: “families”! Sorry, that is totally uncool.
What self respecting 20 year old would like to be associated with creating “families” at work?

Others offer the ‘magic wand’.
In reality what it stands for more often than not is clicking on the space bar to trace around something. Sounds cool.

The magic wand is truly magical, but use it with caution!

Take for example the terrain we created for a project a couple of years ago. While most modelling tools allow you to import XYZ coordinate files form surveyors we often model the site by creating contours from a flatcad survey and give them appropriate heights.
For me the process has the additional benefit of getting to know the topography as the mass is shaped.

The trap is in using the magic wand (spacebar) for tracing a Flatcad contour.
Whereas within seconds you can create a large site – it can turn into a monster that will bug you as long as you have it within your file.

So, tracing those contours manually may be a better option on the long run.




Sunday, April 17, 2011

Guns don’t kill people, people do. Drawings don’t mess up construction, people do.

“It is not about the drawing, it is about the model..” I said previously, then qualified it with the following “It is about neither; it is all about the building.”.
I was wrong, of course. It is all about the people involved.
The drawing is a minor player if not just an accessory. So is the model going to be if it ever becomes central to how we deliver buildings.

What amazes me in my daily work-encounters is people expressing strong believes that with technological advances, we will automatically have better processes in construction.
Does not quite make sense to me: Just because technology is improving that does not mean that human nature is getting better too!
Our proposed saver, IPD did not work in the past NOT because we used the drawing as the main communication tool, nor will it work because we replace it with the digital model.

Come to think of it – IPD was more likely to happen in building deliveries based on drawings but also run under procurement systems that we now call ‘traditional’.

Can see many of you ‘leafing’ through my previous posts to point out the inconsistencies in my opinions (drawing was bad, drawing is good, model is good, model is bad...);

Don’t bother, unless you have missed some of the previous musings.
Guns don’t kill people, people do.


Saturday, April 16, 2011

Let’s change the name for the BIM interoperability file-format;

I am warming to IFC. Have been using it lately and it is getting better...

 Am not quite ready to let BuildingSmart off the hook yet – indeed am preparing to hassle a bit more by voicing my demands on a new (and appropriate) role it should take on within BIM
(and demand relinquishing others that it is holding by default).
That is for the near future.

Today: The unfortunate file-extension: IFC -
IFC  can mean either/both “industry foundation classes” and/or “issued for construction”!

Imagine this conversation:
“Hi Paul, how are you?
....(typical chat)... Can you please forward us your latest IFC model?”
“Hi John... certainly – exactly what IFC are you referring to?..”

It is easy enough to distinguish between the two – if you remember to draw attention to the fact there are two different meanings used regularly.
Almost just as easy to assume one or the other.
Is this ambiguity really necessary?

Let’s change the name for the interoperability file-format;

My suggestions:
MBA – Model Based Aspect (sounds very knowledgable too)
MBF – Model Based Format (clinical and to the point)
IMB – International Model Base (technical and evokes IBM – also the anagram of BIM)
IMF – International Model Format...

Now, if this last one gets confused with the International Monetary Fund, so be it.
And while we are at it, can we get rid of the ‘interoperability’ word?


Friday, April 15, 2011

The significance of the small print!

The small (or fine) print has for long been considered the trap in all sorts of contracts to be wary of by those signing onto the dotted line.

My interest in small print with regards to construction is less to do with the ‘legal contract document between the parties’ as much as the drawings that are parts of contractual sets (issued for tender, construction, variations etc);

I see two manifestations of the small-print in those documents:

The first group comprises any text that is smaller than 2mm when printed.
There may not be anything sinister or manipulative behind giving instructions out via small print – I still treat them with contempt they deserve.
If this is an instructional document telling me what I am obliged to do under a contract, it should be in the main document and not buried in small print. You don’t write a GIVE WAY or STOP sign with lettering too small to read, unless you want to trip someone up with it.

The second group covers the ‘general sheets’, those densely written pages at the fronts of drawing sets, again containing small textual instructions, keys, legends etc.
My issue with these is that they tend to be far too hard to navigate to form essential instructions.

Keep them clear, keep them legible.
Small print should be left to the lawyers.



Thursday, April 14, 2011

A free dinner? The Ideal Standard!

Went to a local “Ideal Standard” presentation last night.
Not being a specifier, I was a bit of a piggy-backker.
Had a nice time regardless.
While enjoying wonderful hospitality provided by the hosts, I mused over bathroom ware – real and digital.

Only a couple of weeks ago I suggested that suppliers of construction products need not bother developing 3D libraries, providing doughnuts (or in my case a luxurious dinner) will suffice in hooking the specifiers to their products.
A couple of days before that (or was it after?) I urged them to put the extra effort in keeping their digital libraries at the low-poly-count end.

Me (“the expert”) yo-yoing like this from one extreme to another – no wonder even leading suppliers are reluctant to do something bold in the digital world of construction.
Or should it be world of digital construction?

Then again, last night while watching the sleek presentation (it was) and absorbing the company’s impressive statistics (they were) I still kept wondering, how come a company that provides ‘entire bathroom solutions’ has not seen it viable to crack the hosted virtual platform game?

I know they have the isolated (though quite clever) 3D-models floating on shareware-sites here and there.
They also offer visualisation services to designers worldwide, their printed material is totally snazzy.

Can they please, take the lead in the digital too?


Wednesday, April 13, 2011

Communication practices in construction are blacker than needed to be;

‘Communication’ is a clever word.
It can mean conveying information one way (me instructing you to do something) and/or two ways (you and I exchanging information about something)

For example, I may put a note on our dining-table in the morning: “Zs clean the dishes!” – this is a one way communication (instruction);
If I come home and find another line below: “Sorry, it is E’s day today” – the communication goes two-ways.

I regularly work with IFC drawings (IFC – issued for construction) soft and hard copies.
I see one-way communication.
Fair enough, they are supposed to convey instructions on how to put the building together. 

Still, I suspect that because they know this communication is one-way – the originators of the material intentionally make the receiver of the information struggle with it more than necessary.

Apart from the previously described pointless mounting of the number of outputs, they use another trick:
Output in DWF format with all lines showing black and with true thickness. This is naughty!

DWF is a good format to use as a reference (non editable) – but not allowing someone to edit information should not also prevent them interpret it in the fastest possible way.

If I was a project manager – I’d prohibit “All black” drawings on my projects.
(even if the hard copies stay greyscale – all the soft copies should be coloured);




Tuesday, April 12, 2011

Computer says no – BIM as Disruptive Technology, take 2

Are you a fan of Little Britain?
You’d know Carol's catchphrase "Computer says no".

I often come across people that believe that the solution to most of the problems of construction is in a yet-to-be invented machine that will turn line drawings produced by building designers into digital 3D+ models for visualisation and planning purposes.

There are people out there now that would invest in such a ‘machine’.
It ‘d be able to have the 1-2000 sheets (that seem to be produced as a minimum for just about any project nowadays) fed in within minutes
(using hardcopies and shredding them up in the process to achieve a dramatic effect).
Following some gurgling, roaring and light- flashing the machine would feed the data into a projector that would then beam the singing-dancing-3D image onto a screen

You may think I am totally loosing it now – but, think again!
We all seem to be so much more prepared to put our hopes in the possible invention of some silly miracle-contraption than facing up to what needs fixing.

What if the machine did exist but also had warning lights that flashed with “garbage in – garbage out”,
and refused to compute the fluff fed into-it?

Would you still carry on producing thousands of mostly useless flatcad originated drawings?

I side with Carol on this one "Computer (should) say no"!



http://www.littlebritainonline.com/

Monday, April 11, 2011

When lost anywhere, nothing is quite as useful as being able to see the ‘big picture’.

Budapest is a lovely city, I am very fond off. Navigating through it can be tricky.
The early challenges of getting around while studying there in the mid eighties taught a lesson that stayed with me for life.

I loved exploring the city, jumping from one vehicle to another, moving below/above ground and water.
What got my head in was though the circular nature of the city, having been developed over 2 concentric, circular routes.
You could chuck-along on a tram for hours – observe landscapes of grey streets going by – and end up in exactly the same place you started off.

Sometime you’d want to reach a destination on you right – a tram going left would come sooner, you’d go with it.
An express bus going the opposite direction could take you there even faster.

What was the lesson coming out of this?
The way I managed to get my head around navigating the city was by memorising the ‘big picture’.

When attempting to do any BIM, seeing the big picture as a reference is hugely important.
It is so easy to get pulled into the details, the challenges of having to deliver meaningful results daily.

Detail is good. However, remember this: sometimes taking the tram that is heading the opposite direction from where you intend to go may just get you there the fastest.



















(not quite Budapest on these pictures but still pretty)