Tuesday, March 8, 2011

Do you want to get more specified? A practical post to building material manufacturers;


Let’s say, you supply thermal insulation;

Do the following:
Create a template for major model-based architectural packages
(i.e.: Revit, Archicad, Microstation);
Include:
·         Intelligent , branded North-Point and a level marker
·         Min 10 wall types typically used by the type of construction you are most active in;
·         Intelligent keys and legend stamps of those walls;

Also,
Have their 2D representation clean and tidy;
Printing without hitches on most printers/plotters.
Perfect representation in sections (fills/hatches consistent and labelled);
Multiple colour options for design.
Material assigned and with dual graphics

Make the graphics really good! (you are aiming at architects after all) – but, include watermarks on the surface of the walls with your own logos. (make them suttle);
These will show up only in design environment and would not do any ‘damage’ to outputs;

The difficulties you’ll face::
Most large companies will brush you off – they have their own templates, drafting manuals and standards to work by. Put them aside for the moment.
Medium sized companies will tell you the same story, however they will be open to give it a try.
Work with them!

This exercise should be pretty inexpensive, most important meet the architect at the level that matters to them.

In a month’s time, repeat the exercise, provide an updated template, now with typical roof types. Then slab (floor structure) types...etc



















Monday, March 7, 2011

Will BIM eliminate the need to perform VEs?


Am I alone in my thinking that there is something fundamentally wrong in having to perform ‘value engineering’ in the late design stages of creating-buildings?

Reminds me of “reading recovery”. A couple of years ago I was on the Board of Trustees of a NZ school.
We celebrated how good we had performed “reading recovery” on children in years 5 and 6.
‘Developed in New Zealand, Reading Recovery is widely implemented in English speaking countries’ they say, and it is supposed to significantly reduce the number of children with literacy difficulties.
I might accept the necessity for this in the first couple of years of learning to read – but 5th and 6th?

There operates quite a nice industry of Value Engineers in AEC.
They promote coming in at later design stages, do workshops and through systematic methods redesign the project to achieve the optimal functions at the lowest possible cost.
Some accept it being a cost-cutting exercise, though many claim it is not.

If I was a building owner, I’d say:
‘Hello! There is something wrong with needing to do VE following buckets of time and money spent on experts designing the thing in the first instance!’.

What has VE got to do with BIM?
Well implemented BIM will totally eliminate the need for what currently goes under the name of VE in building design!















Sunday, March 6, 2011

What colour is your parapet wall?


How do you take your concrete? Light grey or with a lot of black in it?
What about your stainless steel? Aluminium? Cement screed?

Don’t some habits die hard when it comes to documenting buildings?
We build in grey, so we model in grey. Or draw in black on white screens. (or red on black screens!);

You have a complex detail? At the first instance resolve it in your head and try getting away with putting nothing on paper.
Or even better, if there is nothing on the paper, why bother resolving the detail at all?
Hmmm Not the line I was going to take.

My theory is that we, as GOOD building designers/documenters think through every detail and make sure that they are buildable, aesthetically pleasing and do not compromise any proposed use,. head-heights, accessibility, weather-tightness, hygiene, safety and security.

Colour my world! I say.
I am showing my age with this comment but I prefer my details with lots of colours. Pink, baby blue, sunshine yellow! In the digital world at least; So I can work out how the various elements interact to as minute a detail as I like (or not);

Don’t blame the software! Most BIMish packages allow you to use materials that have two ‘identities’ – one for the ‘working-out’ session and one for the ‘final performance’.
Bring on the colours!






Saturday, March 5, 2011

The verbal BIM.


You decide to build a deck.
Call in a builder, tell him that you want the deck to be this high (one step down from the ranch-slider), this long (just past Timmy’s window) that wide (two feet off the apple-tree);
You want it completed before your wife’s BD party, made it from hardwood, the handrail wide enough to support a wine glass and the balusters like the Jones’s.

The builder goes away, then calls and tells you a price. You agree, he comes back and builds it.

Verbal BIM in action. OK, maybe not exclusively verbal and maybe not quite BIM, but it has qualities that many other BIM can’t claim to have:
It has a completed building project and 2 satisfied parties: the client and the contractor;
The third party’s role, that of the designer is split between the client, the builder and commonly known design features (neighbour’s balustrade);

You also achieved two key features of a good BIM:
Integrity and endurance of project information!

In the future you may call back this builder to do your garage, a holiday home or an investment block of flats.

You’ll most likely abandon your unwritten-BIM approach to deliver the subsequent projects and you may or may not have them completed to everyone’s satisfaction.

I hope that the lessons you learned from verbal BIM stay with you.





Friday, March 4, 2011

The project manager of the future will be a 3 headed beast.


He (most likely) will be a ‘traditional’ project manager, a design manager and a bim(anager) all rolled into one.
He will look, feel (maybe even smell) remarkable like architects used to before they got stripped of their magical powers.

He WILL rule the AEC industry. (even more than now)

What do I base this idea on?

All other consultants working within the AEC processes have experienced dramatic decline in their fees and influence.
Project managers have moved as dramatically but in reverse. (forward!);
Good project managers (not all!) have a lot to be admired for.

Think of a triangle where there are 3 parties, one at each nod:
1/ clients with the money and need (for a building, investment...)
2/ all consultants, designers, contractors, subcontractors within AEC
3/ project managers

Their objectives:
Group 2 to sell their time to group 1;
Group 3 to make themselves absolutely fundamental to any project
Group 1 to have their need satisfied the best way ($, T, Q);

Clients pick from group 2 as needed but only because they perceive that they HAVE to.
They engage project managers, because they WANT to;
They are likely to wiggle out of the HAVE-tos whenever they can but they will stick with the WANT-tos even when that may not be essential.

Go project managers, transform to a three headed beast! (more later)




(picture of the 3headed beast borrowed from a lovely Hungarian book on Greek Mythology 
created by my friends, two sisters, Emese and Zsuzsa Rajsli)

Thursday, March 3, 2011

The Light-box continued and How NOT to sell BIM to building owner/developer clients...


I received a record number of comments (off line) on the light-box post;
Their point: why would anyone want to use light-tables when most CAD packages can perform those tasks better?
True.

I believe that there usually are two different ‘worlds’ for any project, the digital one and the hard-copy one and comparably* few people operate in both;
The light-box offers the soft way into BIM, a first step.
If you had moved on from there, good on you!

How NOT to sell BIM to building owner/developer clients...

Especially if you are an architect. (Not that my record is that great with this sector.)

Two lines that are to be avoided no matter how tempting:
·         Charge clients extra so they can have BIM and ALL the benefits it will bring.
(coordinated drawings, clash free design)
I know, fees have been cut to minimum, still clients ALWAY expect from their designers coordinated and clash free drawings.
·         Asking clients to change their way of working to be in synch with your BIM.
Clients I meet consider themselves to be in the driving seat and have very little interest in changing their ways of working. Even when they do decide to change it is never driven by inexperienced consultants trying to climb onto to BIM bandwagon and hoping that clients will ‘fund’ that change.


















Saw an excellent article today: 
http://www.di.net/articles/archive/change_state_in_aec/
Look it up (Thanks Russell!)

* there are many small practices that DO manage to move between the two words fluidly – however by and large most medium to large projects are run by 2 environments being maintained side by side; You may have PCG meetings using projectors and other gadgets but most of the discussions will be based on uncoordinated, often reduced to non-readable hard copy drawings.


Wednesday, March 2, 2011

A Building is the by-product of the drawing process!


Have you ever observed a back-to-frontness of the AEC industry that made you re-evaluate your thinking on processes? The following statement is logical enough:

Any building-creation process has the building as the end product.

Throughout the process numerous drawings/reports/specifications are produced. Logically, these should be considered to be by-products.
Apart from the physical manifestations of the drawings/reports/specifications there are also ‘truckloads’ of digital data used and reused or discarded and recreated throughout the process.

Beyond the unique purpose of addressing different technical tasks these pieces of information have one quality that is common to most:
They are fragile, delicate. Liable to perish, subject to destruction and quick decay or spoilage.

Normally industries that use/rely on highly perishable goods have sophisticated systems in place to account for risks, both by prevention and insurance.
Not so the AEC. Here, perishable data is often neglected and treated with contempt;
Why? Is this due to ignorance or arrogance?

Or is it because in this process, the main products ARE the drawings/reports/specifications and both the Building (gasp!) and the mass of information related to the projects are just by-products.
In this case incidental products derived from the process of creating the drawings/specs/reports, the building may be marketable but the information is considered waste.

This observable (and quantifiable) phenomenon is totally in conflict with almost any other area of our life. 




Tuesday, March 1, 2011

It is all about the systems you put in place!


This is: A LINE
This is: A WINDOW...
(It can sing and dance....)

Goes the BIM rhetoric. Meaning that the line is dumb and no-good
and the singing, dancing window (digital object) is a clever creature....
that will fix everything that ever goes wrong in the AEC industry. (the silver bullet)

I use this introduction in one form or other often too – though am conscious that it is greatly oversimplifying the issue.
It unfairly implies that buildings can’t be documented well in Flatcad. They can be and regularly are.
Also on almost any media. Even verbal one.
As I write this thousands of people are being briefed on building related tasks verbally.

The problem is NOT in the medium we use, the toolset, nor the technique (2d, 3d, 25d);
The problem is that creating buildings is a risky business.
We choose how we deal with those RISKS, often by (unknowingly) absorbing them.

Where the media/toolset/technique/approach comes in is HOW that risk is managed.
Use Flatcad and you need to have systems in place.
Use singing-dancing BIM and you need systems in place.
Do everything through verbal communication and you need systems in place.
(especially large ones for this approach!)

It is all about the systems you put in place!
Most  systems are combinations of simple things and complex things. The secret is in the mixture;





Monday, February 28, 2011

A pre-BIM task: Get (back) into the habit of using a Light (box) table!


The best way to get into BIM (even if you’ve never tried it) is by picking a real construction project.
You don’t have to be on site, not even associated to a contractor to have a role with tasks closely related to the progress of a construction project. You will be assessing drawings (plans) daily.

In the near future, I plan to write about ways to set up a construction-based BIM project.

But, even before I do that – there is a pre-BIM task that I recommend to everyone, everywhere that needs to assess and interpret plans (construction):
Get into a habit of using a Light (box) table!
I am referring here to a ‘physical’ one, a container with several light bulbs (or fluorescent tube)c and a pane of clear glass on the top;

Now, this action of yours will do nothing to improve the quantity or quality of drawings.
At least, not at the beginning.
Do persist! You’ll find interesting things and learn a lot about the content creators of your project:
No scale is actually accurate when printed
Grids from various consultants aren’t always matching
Structure is usually all over the place
Corresponding drawings (that should be easy to coordinate) are always of a slightly different scale
North point is almost always out on some of the drawings;





How to make one?

Sunday, February 27, 2011

A dilemma: should a Project/Designer Manager be BIM literate or not?


Not a loaded questions – really, a genuine interest of mine. See, both options have advantages;
A Building Owner/Developers appoints a Project/Design Manager (or multiple people to fill those roles) so they get better representation, more certainty, good cost control, deadlines achieved and generally keeps all consultants inline.
A project manager manages the project, the participants, the process; The role of the design manager implies technical abilities too – a counterpart to consultants within clients’ representatives.

Having a non-BIM P/D Manager can be useful. They are usually unable to ‘look under the bonnet’ of the project information database so they focus their attention on the outputs, which are contractually most important anyway. They scrutinise drawings in the way contractors would and as such find holes in documentation more easily.

A BIM literate P/D Manager benefits building-project clients by hands-on-working the model based database and is able to look at design options in a more considerate way. Understands the project better and more intimately and is able to change directions at a short notice as required.

You may think that I am already set on one of the answers, but am not;
What I am mostly wondering about is, what do clients prefer to have?
Do they rate the BIM literacy of their Project and Design Managers and does knowing BIM enter the selection criteria-list at all?